Install new flashing metal flashing is often called drip edge along the.
How to install torch on roofing felt.
Also cover up with long sleeved clothing to reduce the chances of an accident.
This will help you get started and you will also learn some tricks.
Hang the lower edge of the felt over the eave the part of the roof that meets or overhangs the shed s walls by about 0 5 to 0 75 inches 1 3 to 1 9 cm.
Installing the roofing felt does take care but can go very quickly.
Watch this video if you want to learn how to use a propane torch on a flat roof.
Fasten drip edge on eaves with.
Choose heat resistant gloves and boots made of a material like kevlar.
Overlap each row at least 3 to 4 inches.
Never install the felt vertically across your roof.
Installing the torch down roofing involves flames and melted asphalt.
Start by laying asphalt felt or other underlayment over the roof.
Some roofing felts are actually glued down.
These thick layers of roofing felt are installed by heating the back of the felt with a butane torch and then carefully applying it to the roof.
The term cold applied is referring to o.
Installing roof felt is a two person job.
Using your staple gun secure the felt to the roof.
Cold process modified bitumen roll roofing is another way to apply rolled roofing other than hot mopping or torching.
Nail metal drip edge flashing which bends over the roof and down the edge of the facing board on all roof edges.