The r panel is a low maintenance durable metal roofing alternative to conventional roofing.
How to install r panel roofing.
Roof pitch our roofing panels require a certain degree of pitch to ensure proper water drainage.
Flashing is metal trim that fits over joints where two sections of roof meet.
You will use metal roofing screws to secure the metal panels to the sheathing.
Try to space the screws about 12 inches apart down the entire piece of metal.
Next put a screw into the fastening strip to keep it steady before installing the screws along the face.
See panel squaring method in this manual.
For roof installations use the pbr panel which has a purlin bearing leg to provide greater support at the laps.
Moreover try to ensure that the screws are all aligned evenly.
R panel requires a minimum pitch of 1 12.
Install the roof substrate according to local building code requirements.
5 outside closure install along upper edge of panels about 2 below the edge.
Make sure the panel is square to the eave of the roof so that all of panels installed afterwards are straight.
Bend the flashing into a v shape to fit over the top roof ridge and the corners where the panels meet.
Along the fastening strip of the sl16 always use the pancake head fastener.
To prevent corrosion immediately remove any loose metal shavings left on roof surface.
The r panel is recommended for use on side walls only.
It helps direct water away from the.
The ir panel is used on side walls only.
After installing roof remove any debris such as.
Drive through the outside closure and the ribs of the panel beneath.
4 panel wood screw space according to recommended fastening pattern and local codes.
As a general principle the less steep the.
The flashing should overlap the edge of the roof by one inch to help direct.
This means that the minimum roof slope required for all panels is 1 inches of rise per foot.
It s ideal for retro fitting over existing composition shingles and it saves time labor and disposal costs which means a lower total project cost.
Install the panel a minimum of 3 up from the water diverter at the bottom of the valley and minimum of 3 down from the top of the valley.
And for any exposed fasteners try to avoid over tightening them.
Choose from many designer colors for a sleek attractive appearance.