Space the screws about 12 in 30 cm apart.
How to install metal roofing over plywood.
In reading online it seems wise to install a vapor barrier over the plywood to prevent condensation from getting adsorbed into the plywood from the steel roof.
When using plywood nail it directly to the purlins and screw the metal roofing panels through the plywood into the purlins as instructed by the manufacturer.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
And for any exposed fasteners try to avoid over tightening them.
In this installation the vapor barrier is installed on the side of the insulation nearest the interior of the building.
Inspect the plywood for damaged areas.
Use your neoprene washer head screws to secure the metal to the sheathing.
In this video i m installing some metal roofing over an existing ash fault shingled roof.
For exposed fasteners avoid over tightening the fastener.
Remove all unused vents pipes and protrusions.
How to install metal roofing over plywood inspect your plywood.
Sweep the plywood clean of all dirt and debris with a push broom.
Place the first screw.
How to apply metal roofing over plywood step 1.
Try to space the screws about 12 inches apart down the entire piece of metal.
Most metal roofs will also require underlayment as well as a slip sheet.
But it seems the condensation will affect the 2x4 strapping.
After the original roofing is removed what you will want to do first is look for bad pieces of.
Moreover try to ensure that the screws are all aligned evenly.
Make sure that the screws are all aligned evenly as you will be able to see them from the ground if they are.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
To watch the entire series from the beginning click here.
I was planning on putting plywood over the rafters and cross the rafters with a 2 x4 every 16 to secure the metal roof to.
Repair any rotted sections of plywood before installing the metal panels.
This is not a complete install only basic install on a bungalow i.