Mark the wall for vertical furring strips installed 16 inch on center.
How to fur a concrete wall.
Mark the cinder block wall every 16 inches vertically and then every 16 inches horizontally to form a grid pattern.
With a pencil or a marker draw vertically lines from.
Pre drill the holes in the furring strips so they do not crack when.
Using the level plumb down the wall and draw a line for reference.
Now repeat this process at the top of the wall.
Clear the holes of all.
Equip yourself with a tape measure and spread it cross the bottom of the wall your about to furr out.
Whether poured or block built properly a concrete wall is strong and will not rot warp or invite termites and other.
Using a hammer drill drill holes using the correct diameter carbide tipped masonry bit for the concrete screw diameter.
You can t deny that concrete walls are efficient.
Use chalk to draw the lines and a straight edge as a guide.
Determine spacing and location of furring strips.
Step 2 place the first furring strip over a vertical line.
How to frame poured walls.
Tapcon concrete screw installation.
These markings will indicate where you will vertically attach your.