After the time has expired fold the lower half of the rubber strip on top of the upper section and run a broom over the exposed rubber and roof.
How to epdm roofing.
Epdm step by step clean the roof.
Epdm is installed over a special felt covered insulation board.
Position the epdm membrane.
Let is sit on the roof for 30 minutes.
Carefully fold the membrane back over the section and roll flat.
1 0 the first step is to gather your tools and materials roll of epdm roofing adhesive drip edging.
Overlap the two rubber membranes by 75mm 3inches overlap the two rubber membrane sheets to be joined by 75mm 3inches.
The material can now be rolled out and laid into the required position across the surface of.
Although this seems like an obvious first step it s important to ensure that it s done thoroughly.
Screws and large metal fastener plates secure the insulation board to the roof deck.
Two part clip together this type of drip trim comes with a back plate which is nailed to the roof where you require the drip.
The epdm membrane is then sandwiched between this a bead of mastic and the front trim which is finally nailed with stainless steel plastic topped pins to finish.
Apply the adhesive to both the epdm rubber roof material and the roof itself with a roller.
Complete installation of a classicbond epdm roofing system with and sureedge roof trim system to a flat roof.
Step 3 apply adhesive.
Applying bonded adhesive to roof and wall edges sealing roof corners using pressure sensitive flashing such as elastoform creating watertight seals for any equipment with roof penetrations affixing the drip edge wall trim and gutter trim using screws.