If you re building a long wall build the frame in sections.
How to do a concrete retaining wall.
Prepare the foundation step 1.
Finish the surface of the wall as desired.
For row one knock off the flanges with a hammer and chisel so the.
Build the footing and insert.
The concrete retaining wall is often a dull gray color or whitewashed but you can stain it to be many other colors.
Adjust for sloping ground.
Of leveling sand and half the height of the first course of blocks.
Drive a nail into the concrete here.
Cross section of a retaining wall a cinder block retaining wall is only as straight and solid as the base it s built on.
How to build a concrete wall figure a.
Measure and mark footing locations.
See below for more information on contraction joints remove forms and install waterproofing and drainage system.
Then use the marking paint and measuring tape to lay.
Like the flagstone patio.
How to do it build and prep footing.
If your frame is tall you may need to begin.
Scrape off excess mortar.
If you re building your own forms you will probably.
With the layout marked you can begin digging the trench.
The process to do so is relatively simple but it does take time and specialized materials some of which are potentially harmful.
Allow concrete to cure.
Dig for the first row of block.
Tall wall excavate a trench deep enough to accommodate 4 to 6 in.
Try to make the frame pieces as long as you need them to be.
To bury the first row.
Follow the simple steps below to safely and effectively stain your concrete retaining wall.
How to pour a concrete retaining wall.
Rest the frame pieces against a solid surface to prevent them from falling.
Lay out the wall and excavate the slope and the footing trench.
If the wall exceeds four feet in height footings should be poured separately.
So if your wall is 8 inches wide your two nails should be 8 inches apart.
Measure from the edge of your concrete footing to the point where the outside face of your wall will be.
As you lay the second course of block insert weep holes 3 4 inch pipe into the mortar every third.
Refer to the plan or schematic for the retaining wall.